Llys Hafan, sA1
Gwalia Housing

This project of 54 apartments is located in the Maritime Quarter of Swansea’s SA1 Development. Comprising 3 blocks of 4 storey apartments complete with timber sliding sun screens, basement parking and landscaped communal areas. This project was undertaken for Gwalia Housing Group  to provide executive style accommodation at the heart of Swansea’s ‘new exclusive address’. Heating and hot water is provided to each apartment from the central boiler plant and combined with other energy saving products, this development achieved the Eco Homes ‘Good’ standard. Due to close liaison with the local police, this development also achieved ‘Secured by Design’ certification.

 

 

Externals 8e, Old BARN ESTATE
Newport City Homes

We are delighted to be appointed as the contractor of choice to work with Newport City Homes, delivering the Externals 8E contract on the Old Barn Estate, Newport. Works comprise of re-roofing, cavity insulation extraction, external weatherboard cladding, communal window replacements, loft insulation, replacement canopies and the removal of chimneys and other related works.

 

 

mARINER'S COURT, SA1
COASTAL HOUSING

Based at the heart of Swansea’s innovative SA1 area, this new build development comprises of 80 fully serviced apartments overlooking the Maritime Quarter. The 4, 5 and 6 storey block have a timber framed structure with single ply membrane mono pitched roofs, Scandinavian composite aluminium/pine windows and walk on steel and glass balconies. There is also one-to-one car parking achieved by a secure underground car park. Heating and hot water is provided to each apartment from a central boiler. Combined with other energy products, this development achieved the Eco Homes “Good” standard. This was also the first development on SA1 to achieve “Secured by Design” certification awarded by the local police force.

 

 

gODRECOED sheltered accommodation
npt homes

We have been selected as contractor of choice to refurbish an existing residential complex for NPT Homes. Works comprise of general building works to the sheltered block converting the existing bedsit flats into 1 bedroom self- contained flats. This includes a large amount of general building works such as; removing internal walls and building new stud partitions to the new layout, fitting brand new kitchens & wet rooms which are compliant to WHQS & RNIB standards, carrying out external works including a new preformed bin store, a new purpose build entrance canopy and a large paved area.

 

High street, swansea
family housing association

This contract involved the demolition of an existing building on one of the main routes into the centre of Swansea, in close vicinity to the train station.  The contract involved close links with an archaeologist throughout the excavation stage due to it’s location adjacent to an old graveyard. The building was of traditional construction with concrete beam and block floors. The external façade included glazed panels and a rendered finish. The property was constructed for use as supported housing for vulnerable occupants, therefore all internal fittings were of a high specification due to the nature of the end user. These included underfloor heating, fully computer controlled heating and electrical system, trace hot water heating, lift, flood detectors, and a Photovoltaic system on the roof. The end user was highly delighted with the finished scheme, which exceeded expectations with very high quality.

 

 

Kitchen & bathroom framework
npt homes

This 5 year framework consisted of full kitchen and bathroom refurbishment and replacement to WHQS standard in occupied properties for NPT Homes. This contract followed a  fast paced programme with 15 properties being completed weekly with annual totals of around 700. Working collaboratively with the client from the outset ensured high tenant satisfaction scores throughout the framework.